Project Profiles
Brandywine Realty Trust
401 Plymouth Road
Plymouth Township, PA |
|

|
| Scope: |
This significant project for Brandywine Realty Trust, a repeat customer of Nason and Cullen, Inc., is the construction of a new six-floor, 210,000 square foot class A office building situated on 12.5 acres of land in Plymouth Township, PA adjacent to the Pennsylvania Turnpike. Each floor of the building is 33,000 square feet with nine foot high ceilings and features energy efficient glass and a state-of-the-art HVAC system.
This project includes a four-story, attached structured parking garage equipped to handle 700 vehicles.
In addition Nason and Cullen, Inc. has completed fit-outs in excess of 100,000 square feet, including the building conference center and office space for CBIZ Century Business Services, Inc., Brandywine Realty Trust and Philanthropic Life.
|
| Value: |
$24,000,000 |
| Architect: |
Office Building - Garrison Architects
Parking Garage - Phillip Jordan Architects
CBIZ Century Business Services, Inc.- Polek Schwartz Architects
Brandywine Realty Trust- Polek Schwartz Architects
Building Conference Center- Polek Schwartz Architects
Philanthropic Life- Meyer Associates, Inc. |
| |
Saint Joseph's University and Saint Joseph's Preparatory School
Robert M. Gillin, Jr. Boathouse and the J. Vincent Taggart, SJ Center
Schuylkill River, Philadelphia, PA |
|

|
| Scope: |
This project is the construction of a new boathouse along the Schuylkill River adjacent to Boathouse Row, and is the first boathouse to be built along the river in the past 100 years. The boathouse will house the School's "Rowing Hawks" and will include storage bays for the boats and training areas and locker facilities for the students.
|
| Value: |
$3,200,000 |
| Architect: |
Robert L. Owen - Architects |
| |
Paoli Memorial Hospital
Phased Renovations
Paoli, PA |
|

|
| Scope: |
This phased renovation project included the construction of a new Heart Center with a 2nd floor overbuild for two state-of-the-art Cardiac Operating Rooms, relocation of the Physical Therapy area to make way for two new cardiac catheterization laboratories, new support space and a new cardiac catheterization recovery room. The expanded Family Centered Maternity Unit included the transformation of existing short procedure rooms into six new LDRP birthing suites, a building link between two wings, a fully-equipped operating room for cesarean sections, a new nursery, nurse’s stations, support and storage space. In addition, the ICU/CCU area was renovated while occupied.
|
| Value: |
$6,400,000 |
| Architect: |
Ewing Cole Cherry Brott |
| |
|
| |
Universal Health Services
Central Montgomery Medical Center,
Addition and Renovation to existing ER
Lansdale, PA
|
|

|
| Scope: |
This project is a 10,000 SF addition and renovation to the Emergency Room at Central Montgomery Medical Center.
The renovation and addition included a complete gut, reconfigure and reconstruction of the existing ER. The project consisted of the construction of a new canopy and ER entrance to the building, new waiting areas, exam rooms, as well as a new admitting area. Also, a cardiac resuscitation room and decontamination room were added to the facility. Nason and Cullen completed this entire multiphase renovation during regular hospital hours without disturbing the existing emergency room daily operations. |
| Value: |
$1,500,000 |
| Architects: |
Francis Cauffman Foley Hoffmann Architects |
| |
|
Nolen Companies/Fountain Street Partners, LLP
Fountain Street Warehouse Conversion and
Site Restoration
Manayunk, PA
|
|

|
| Scope: |
This project is the restoration of an abandoned, 5-story warehouse into a new self-storage facility along the canal in Manayunk. The project involves selective demolition, and significant renovations and fit-out to the interior of the 100,000 square foot facility to convert it into the new facility. |
| Value: |
$3,500,000 |
| Architects: |
Architetra |
|
|
|
Citizens Bank, Clair Odell Group
Complete Gut and Office Renovation
Norristown, PA
|
|

|
| Scope: |
In June of 2003 Nason and Cullen, Inc. finished this project which included a complete gut and renovation of the Clair Odell Group on the 4th floor of the Citizens Bank building in Norristown, PA.
This project included the construction of several new offices, 3 new conference rooms, all new ceilings, walls and tile, painting of the entire 4th floor, removal and replacement of the existing carpeting, complete renovation of the main lobby with glass doors, and the removal and replacement of the existing light fixtures throughout the office. The project also included the construction of a new workout room and 2 showers on the 3rd floor.
|
| Value: |
$700,000 |
| Architects: |
The Knabb Partnership |
|
Litvin, Blumberg, Matusow & Young
The Widner Building
Philadelphia, PA
|
|

|
| Scope: |
In July of 2003 Nason and Cullen, Inc. finished this project which included a variety of renovations at Litivin, Blumberg, Matusow &Young on the 18th floor of the Widner Building in center city Philadelphia.
This project included the construction of a new conference room, renovation of three existing conference rooms and the office Library, Miscellaneous individual office renovations, painting of the entire 18th floor, removal and replacement of the existing carpeting, complete renovation of the main lobby, and the removal and replacement of the existing light fixtures throughout the office. Renovations including carpet replacement and painting also took place on the mezzanine level of 17A.
This was a 2nd shift project and did not cause any disruptions to the day to day activities of the office. |
| Value: |
$490,000 |
| Architects: |
Francis Cauffman Foley Hoffmann Architects |
|
Downingtown Area School District
Downingtown West High School,
Additions and Alterations
Downingtown, PA
|
| Scope: |
This project's scope of work is 310,000 square feet and included a massive renovation and a new addition to the school. The 220,000 square foot renovation of the existing school included technology labs, the library, computer classrooms, three gymnasiums, locker rooms, the auditorium, cafeteria and fine arts rooms. The new 45,000 square foot one and two-story additions houses physics labs, technology labs, drafting and manufacturing labs, biology labs, a TV studio, chemistry labs and graphic arts space. |
| Total Project Value: |
$25,200,000 |
| Nason and Cullen, Inc. Project Value: |
$16,400,000 |
| Architects: |
Vitetta |
|
Albertson's, Inc.
Acme Supermarket Remodel
Narberth, PA
|
|

|
| Scope: |
This project is a 36,000 square foot remodel of an existing supermarket. The remodel includes complete interior demolition, renovations and a 10,000 square foot addition incorporating an enlarged loading dock facility, new electrical and mechanical systems, a new front exterior façade and entrance, extensive sitework and ADA compliant modifications. The new full-service supermarket will include amenities such as self-checkout stations, a take-out meal center, bakery and photo center. |
| Value: |
$3,500,000 |
| Architects: |
Cuhaci & Peterson Architects, LLC |
|
Ancillae Assumpta Academy
Fine Arts and Technology Center
Wyncote, PA |
|

|
| Scope: |
This project is a four-level, 40,000 SF addition to Ancillae Assumpta Academy. There is a below grade level, and three levels above grade. The first floor houses a rehearsal hall, multi-purpose room, instrumental practice areas and support facilities. An auditorium surrounded by office space and support facilities will be located on the second floor, and the third floor will consist of an art room and a veranda for students to perform artwork. |
| Value: |
$6,700,000 |
| Architect: |
BLM Architects |
|
Miele, Inc.
New Addition to Corporate Headquarters
Princeton, NJ |
|

|
| Scope: |
This project included the construction of a two-story, 23,000 square foot addition to Miele, Inc.'s U.S. Corporate Headquarters in Princeton, NJ. The new addition houses administrative, laboratory and testing, and manufacturing space. |
| Value: |
$6,000,000 |
| Architect: |
Michael Graves and Associates |
|
MCP Hahnemann University
Various Isolation Room Renovations
Philadelphia, PA |
| Scope: |
This project consisted of a 35,000 square foot renovation of approximately 20 various Isolation Rooms on various floors of the hospital and consists of large scale HVAC work. |
| Value: |
$1,500,000 |
| Architect: |
PWI Engineering |
| |
First Judicial District of Pennsylvania
Relocation of Civil Courtrooms to City Hall
Philadelphia, PA |
|

|
| Scope: |
This project, at approximately 14,500 square feet, involved the relocation of the First Judicial District of Pennsylvania's Civil Courtrooms from the Wanamaker Building to City Hall in center city Philadelphia. It includes the renovation and construction of three courtrooms on the 6th floor and the addition of new administration offices.. A unique feature of this project is the innovative design and state-of-the-art equipment in Courtroom 21, one of only four courtrooms of its kind in the country. |
| Value: |
$5,000,000 |
| Architect: |
Vitteta |
|
Central Montgomery Medical Center
Formerly North Penn Hospital
Radiology Department Renovations
Lansdale, PA |
| Scope: |
This project, at 3,300 square feet, included the demolition of existing space and the construction of a new MRI (Magnetic Resonance Imaging) and Intervention Radiation Room. |
| Value: |
$800,000 |
| Architect: |
Francis Caufman Foley Hoffmann, Architects Ltd. |
|
Radisson Plaza Warwick Hotel
Meeting Room Renovations
Philadelphia, PA |
| Scope: |
This project is a 13,000 square foot renovation that includes demolition of 20 guest rooms to make way for three new meeting rooms, two pre-function rooms and support space. |
| Value: |
$900,000 |
| Architect: |
Daroff Design, Inc. |
|
OTG Management Inc.
Jet Rock Bar & Grill
Philadelphia International Airport |
| Scope: |
This project is a new 4,200 square foot rock and roll themed, full-service restaurant that is located in Terminal D and will include 47 televisions throughout the restaurant and six pool tables. |
| Value: |
$720,000 |
| Architect: |
Z Tecture PC |
|
Waldron Mercy Academy
Summer Renovation
Merion Station, PA |
| Scope: |
This renovation includes the lobby, cafeteria and classrooms. The building’s handsome 1920’s marble lobby was enhanced with new lighting, as well as a beautiful wooden reception desk and sculpture display. In support of the School’s extensive music education program, an existing gym was converted to music classrooms and instrument teaching rooms. |
| Value: |
$600,000 |
| Architect: |
Bower Lewis Thrower |
|
Lankenau Hospital
Cancer Treatment Center Radiation Oncology Facility
Wynnewood, PA |
|

|
| Scope: |
This project is a new 10,000 square foot renovation with Lankenau Hospital that will convert a space, originally built by Nason and Cullen in the early 1980’s, into a Radiation Oncology Facility for the hospital’s Cancer Treatment Center. |
| Value: |
$1,500,000 |
| Architect: |
Ewing Cole Cherry Brott |
|
Northwest Airlines
Jet Bridge Foundation
Philadelphia International Airport |
| Scope: |
This project is a renovation design-build collaborative effort of both Nason and Cullen and Jet Bridge Technologies, Inc. of Dallas TX. It will provide a new foundation that is able to support the weight of a passageway—which is manufactured by Jet Bridge—that will connect airplanes to Gate E2. |
| Value: |
$1,500,000 |
| Architect: |
DPK&A Architects, LLP |
|
Jeanes Hospital
MRI and CT Scanning Room
Philadelphia, PA |
|

|
| Scope: |
This project is a 3,600 square foot project which includes sitework, foundation work and mechanical and electrical systems for a new MRI ( Magnetic Resonance Imaging) and CT (Computerized Topography) Scanning Room at the Jeanes Hospital Radiology Department. |
| Value: |
$300,000 |
| Architect: |
Robert D. Lynn Associates |
|
|
|